+44 (0) 1242 820 820 info@astorbannerman.co.uk
0 Items
Astor Bannerman
  • Products
    • Product Downloads
    • Bathing
      • Baths In The Home
      • Baths In Care
    • Changing
      • Changing Tables In The Home
      • Changing Table In Care
      • Changing Tables In Changing Places
      • Changing Tables In Education
    • Showering
    • Ceiling Hoists
    • Floor Hoists
    • Wash Basins
    • Toilets
    • Privacy Screens
    • Accessories
      • Bath Accessories
      • Changing Table Accessories
      • Changing Places Accessories
  • Changing Places
    • Funding in Scotland
    • What is a CPT?
    • CPD Training
    • Equipment
    • Case Studies
    • International
    • Project Management
    • Install Support
  • Astor Academy
    • CPD, Training & Demos
    • Webinars
    • Brochures, Advice & Useful Links
    • Support by Site Location
      • Changing Places Toilets
      • OTs & Social Services
      • Schools, Colleges and Universities
      • Case Management
      • Care Homes
      • Architects & Design Consultants
      • International Projects
  • Projects
    • Case Studies
    • Gallery
  • About Us
    • About
    • FAQ
    • Careers at Astor Bannerman
    • Sustainability
    • Newsroom
    • Newsletter Sign Up
  • Contact
Select Page
Improving Daily Life: Accessible Bathing and Hoisting Solutions for a Young Child

Improving Daily Life: Accessible Bathing and Hoisting Solutions for a Young Child

Jan 8, 2025 | Accessible Bathroom Case Study, Case Studies, Company News, News

At Astor Bannerman, we don’t just provide accessible bathing equipment – we partner with families to deliver thoughtful, tailored solutions that meet their unique needs now and in the future. By combining our expertise with a personalised approach, we ensure that...
H-Frame Hoist Installation: Nishkam High School, Birmingham

H-Frame Hoist Installation: Nishkam High School, Birmingham

Jan 3, 2025 | Case Studies, Company News, Education Case Study, News

Astor Bannerman recently installed an H-Frame Ceiling Track Hoist in the hygiene room at Nishkam High School in Birmingham. This system provides safe and reliable support for students requiring additional assistance, ensuring the school’s facilities meet high...
Changing Places at University Station: Accessible Travel for Everyone

Changing Places at University Station: Accessible Travel for Everyone

Dec 20, 2024 | Case Studies, Changing Places, Changing Places Case Study, Company News, News

Astor Bannerman is proud to have supported the installation of a fully equipped Changing Places facility at University Station in Birmingham. Located within the station’s newly modernised building, this facility ensures individuals with complex disabilities can travel...
Changing Places Toilet at the National Memorial Arboretum

Changing Places Toilet at the National Memorial Arboretum

Dec 19, 2024 | Case Studies, Changing Places, Changing Places Case Study, Company News, News

At Astor Bannerman, we are committed to helping public spaces meet the needs of all visitors. The installation of a Changing Places toilet at the National Memorial Arboretum in Lichfield demonstrates how thoughtful design and adherence to building regulations can...
Changing Places in Universities: Aston University

Changing Places in Universities: Aston University

Dec 17, 2024 | Case Studies, Changing Places, Changing Places Case Study, Company News, Education Case Study, News

We are proud to have supported Aston University with the installation of a Changing Places facility in the Main Building of its central Birmingham campus. This vital addition ensures the university provides essential accessibility for students, staff, and visitors...
Upgrading a Bathroom for Accessibility, Therapy, and Independence

Upgrading a Bathroom for Accessibility, Therapy, and Independence

Dec 13, 2024 | Accessible Bathroom Case Study, Case Studies, Company News, News

At Astor Bannerman, we pride ourselves on supporting families and individuals with mobility needs by designing and installing accessible bathroom solutions. In this case, the client’s stepfather reached out to us to update their bathroom equipment to better suit the...
Providing a Safer and More Comfortable Bathing Experience

Providing a Safer and More Comfortable Bathing Experience

Dec 12, 2024 | Accessible Bathroom Case Study, Case Studies, Company News, News

At Astor Bannerman, we understand that every individual has unique needs when it comes to accessible bathroom solutions. That’s why we work closely with families, Occupational Therapists, and other professionals to design bespoke adaptations that enhance comfort,...
Transforming Accessibility in Mainstream Education: Our Lady Fatima School Hoist Case Study

Transforming Accessibility in Mainstream Education: Our Lady Fatima School Hoist Case Study

Dec 9, 2024 | Case Studies, Company News, Education Case Study, News

At Astor Bannerman, we are passionate about helping schools create truly inclusive environments where every child can thrive. Recently, Our Lady Fatima School took a significant step towards accessibility by installing a Hygiene Room, complete with an Astor OT200...
An Accessible Bathroom Transformation for a Client with Limited Mobility

An Accessible Bathroom Transformation for a Client with Limited Mobility

Dec 4, 2024 | Accessible Bathroom Case Study, Case Studies, Company News, News

At Astor Bannerman, we specialise in creating accessible bathroom solutions that help people with complex needs live more comfortably and independently at home. Our team works closely with clients, their families, and Occupational Therapists, to design and install...
Melbourne Airport: Changing Places Installation (CHS Healthcare)

Melbourne Airport: Changing Places Installation (CHS Healthcare)

Dec 4, 2024 | Case Studies, Changing Places, Changing Places Case Study, Company News, International, News

At Astor Bannerman, we are proud to collaborate with like-minded organisations that share our commitment to enhancing accessibility for all. One such collaboration is with CHS Healthcare, who recently installed a Changing Places facility in Melbourne Airport’s...
Complex Hoist Installation in a Changing Places Facility at Fishponds Library

Complex Hoist Installation in a Changing Places Facility at Fishponds Library

Dec 2, 2024 | Case Studies, Changing Places, Changing Places Case Study, Company News, News

We take pride in delivering fully accessible Changing Places facilities, tailored to each project’s unique challenges. One of our recent installations at Fishponds Library stands out as a testament to our team’s expertise and innovative approach to complex...
Changing Places vs. Hygiene Rooms: Understanding School Specifications

Changing Places vs. Hygiene Rooms: Understanding School Specifications

Nov 14, 2024 | Case Studies, Changing Places, Changing Places Case Study, Company News, Education Case Study, Guides, News

In school settings, particularly in primary and secondary institutions, selecting the right accessible facilities is essential. Too often, architects specify Changing Places facilities for schools—a costly and frequently unnecessary choice that can create confusion...
Are Your Changing Places Drawings Compliant? Key Considerations For Your Drawings.

Are Your Changing Places Drawings Compliant? Key Considerations For Your Drawings.

Nov 12, 2024 | Case Studies, Changing Places, Changing Places Case Study, Company News, Guides, News

Specifying Changing Places facilities on architectural plans requires a precise understanding of building regulations and the unique requirements these spaces must meet. As demand for accessible spaces grows, creating a Changing Places room that is fully compliant...
Inclusive and Accessible: Our Visit to We The Curious

Inclusive and Accessible: Our Visit to We The Curious

Nov 11, 2024 | Changing Places, Changing Places Case Study, Company News, News

Our marketing team recently spent an exciting day at We The Curious in Bristol with Leo and Jess from L&J Cool Access Consultancy, two advocates for accessibility who joined us to experience just how inclusive this unique venue really is. Located in the heart of...
We Did It! Astor Bannerman Wins “Team of the Year” for Changing Places!

We Did It! Astor Bannerman Wins “Team of the Year” for Changing Places!

Nov 11, 2024 | Changing Places, Changing Places Case Study, Company News, Events, News

We are beyond thrilled to announce our victory as “Team of the Year” at the SoGlos Business Awards 2024 for our work with Changing Places and our innovative approach to the market. This award represents a monumental milestone for us and shines a spotlight...
Accessibility at Sainsbury’s Witney: Changing Places Toilet Facility for Inclusive Shopping

Accessibility at Sainsbury’s Witney: Changing Places Toilet Facility for Inclusive Shopping

Oct 28, 2024 | Case Studies, Changing Places, Changing Places Case Study, News

We’re committed to making shopping spaces across the UK more inclusive and accessible. Our collaboration with Sainsbury’s Witney is a significant step toward creating supermarkets where everyone, regardless of ability, can shop with ease, dignity, and independence....
Education Estates Manchester: Showcasing Innovations in School Hygiene Rooms

Education Estates Manchester: Showcasing Innovations in School Hygiene Rooms

Oct 23, 2024 | Company News, Education Case Study, Events, News

Astor Bannerman had an incredible time exhibiting at the Education Estates event in Manchester, October 15-16. Stationed at stand 117, our team showcased some of our most innovative equipment designed to enhance hygiene rooms in schools. This year’s event was all...
Inclusive Facilities: Changing Places Toilet at Yorkshire Dales National Visitor Centre

Inclusive Facilities: Changing Places Toilet at Yorkshire Dales National Visitor Centre

Oct 21, 2024 | Case Studies, Changing Places, Changing Places Case Study, Company News, News

We are proud to support inclusivity and accessibility by supplying essential equipment for the Changing Places facility at the Yorkshire Dales Visitor Centre in Grassington. Our solutions are designed to ensure that individuals with complex care needs can fully enjoy...
New Accessible Changing Places Toilet at Page Park, Bristol

New Accessible Changing Places Toilet at Page Park, Bristol

Oct 11, 2024 | Case Studies, Changing Places, Changing Places Case Study, Company News, News

At Astor Bannerman, we are proud to have been part of the installation of a brand-new Changing Places toilet at Page Park in Bristol. This beloved park, located in Staple Hill, South Gloucestershire, is a cherished green space that offers a variety of recreational...
Changing Places Toilet: Manchester Museum

Changing Places Toilet: Manchester Museum

Oct 9, 2024 | Case Studies, Changing Places, Changing Places Case Study, Company News, News

At Astor Bannerman, we are proud to have contributed to the creation of an inclusive environment at Manchester Museum by supplying essential equipment for their Changing Places facility. Our products help ensure that people with complex care needs can fully...
Transforming Welsh Schools with Accessible Hygiene Solutions: Penygawsi and Llanilltud Primary Schools

Transforming Welsh Schools with Accessible Hygiene Solutions: Penygawsi and Llanilltud Primary Schools

Sep 30, 2024 | Case Studies, Company News, Education Case Study, News

At Astor Bannerman, we are dedicated to providing accessible and innovative hygiene solutions that enhance the learning environments for students across Wales. Recent projects in collaboration with Morgan Sindall Construction demonstrate our continued efforts to...
A Visit to Accessible Edinburgh: Changing Places Toilets in Action

A Visit to Accessible Edinburgh: Changing Places Toilets in Action

Sep 26, 2024 | Case Studies, Changing Places, Changing Places Case Study, Company News, News

Enhancing accessibility and inclusivity is at the heart of what we do. Recently, our team visited Scotland’s vibrant capital, Edinburgh, to explore some of our Changing Places installations and see firsthand how they are transforming the travel and shopping...
NHS Installation: The New Changing Places Toilet at Lister Hospital

NHS Installation: The New Changing Places Toilet at Lister Hospital

Sep 24, 2024 | Case Studies, Changing Places, Changing Places Case Study, Company News, News

In a world where inclusivity is becoming increasingly important, ensuring accessibility for all is paramount. The recent installation of a Changing Places Toilet at Lister Hospital, led by Richard Strangward of NHS Hertfordshire, marks a significant step forward in...
Reading Civic Offices Unveils State-of-the-Art Changing Places Facility

Reading Civic Offices Unveils State-of-the-Art Changing Places Facility

Sep 4, 2024 | Case Studies, Changing Places, Changing Places Case Study, Company News, News

In a significant move toward inclusivity, Reading Civic Offices has proudly launched a brand-new Changing Places facility, further cementing its commitment to providing accessible spaces for all members of the community. Funded by the Department for Levelling Up,...
« Older Entries
Next Entries »

News by category

Latest news

  • What Should a Hygiene Room in a School Include?
  • Changing Places Toilet: University of Exeter – Sarah Turvill Multifaith Centre
  • Changing Places Toilet: Oswestry Public Toilets
  • Eslyn Henley Richiez Learning Centre, British Virgin Islands – Specialist Hoists & Accessible Wash Basin Installation
  • Changing Places Toilet: Winkworth Arboretum
  • A Tailored Bathing Solution with the Compact Plus
CONTACT

Astor Bannerman
The Elephant Works
Andoversford Link
Cheltenham
GL54 4LB

sales@astorbannerman.co.uk

info@astorbannerman.co.uk

Tel: +44 (0) 1242 820 820

Quick Links

  • Careers
  • FAQs
  • Terms & Conditions
  • Privacy Policy
  • Cookie Policy
  • Modern Day Slavery Policy
  • Environmental Policy
  • Register a Warranty
  • Newsletter Sign Up

FOLLOW US

  • Follow
  • Follow
  • Follow

ASTOR BANNERMAN GROUP

Copyright © 2025 Astor-Bannerman | All rights reserved | Nettl

Warranty Registration | Astor Bannerman

To ensure the manufacturer’s warranty on your equipment is 100% validated, please complete the form.

This field is for validation purposes and should be left unchanged.

About You

Full Name(Required)
Email(Required)

The Equipment

Where is the equipment located?(Required)

Repair Authorisation

For chargeable repairs, who is responsible for authorising and paying for the works?
Contact Name
Are you authorised to instruct Astor Bannerman to carry out chargeable works?
If the cost of parts are under £50.00 +VAT
If the cost of parts are over £50.00 + VAT
To proceed with repairs is a Purchase Order required?

Astor Bannerman will not pass your information on to any third party unless required to do so by law or it is essential for the implementation of a service contract or warranty callout. Astor Bannerman will always try to contact you in the unlikely event that a safety issue is identified with your equipment.
Thank you for taking the time to update our service contracts contact details. Would you be intrested in completing a short Customer Satisfaction survey? Your feedback would be greatly appreciated.
How satisfied are you with the standard of service you received from Astor Bannerman Medical Ltd.
How responsive were Astor Bannerman Medical staff to your enquiries?
How polite and helpful were Astor Bannerman Medical Ltd's engineers?